Every Dubai launch in the last 30 days (to 11 Oct 2026)
These are the projects that appeared on the DLD register between 12 Sep 2026 and 11 Oct 2026. "First listed" is the date the project showed up in our reading of the register. The register does not publish a registration date of its own, and we do not read it every single day, so the real registration happened on or shortly before the date shown.
The escrow column is the one worth your attention. Until that account is open the developer cannot lawfully take your money, however far along the marketing is.
21 of these 22 launches do not have an open escrow account yet. That is normal this early, but it is also the single thing to check before paying anything.
| First listed | Project | Developer | Area | Escrow |
|---|---|---|---|---|
| 7 Oct 2026 | Gloas | Acube Gloas | Palm Deira | Not yet open |
| 7 Oct 2026 | Volu by Asak | Asak | Al Barshaa South Third | Not yet open |
| 6 Oct 2026 | 06 Life Residences | Deniz Properties | Al Warsan First | Not yet open |
| 6 Oct 2026 | Arche Residence by Evera | Evera | Madinat Al Mataar | Not yet open |
| 6 Oct 2026 | Callista by Zoya | Zoya One Real Estate Developments | Madinat Al Mataar | Not yet open |
| 6 Oct 2026 | Rigel | Acube Rigel | Me'Aisem First | Not yet open |
| 3 Oct 2026 | Marquis Aura | Marquis Star | Madinat Al Mataar | Not yet open |
| 3 Oct 2026 | NBCC Al Jawhara (The Jewel) | Nbcc Overseas Real Estate | Al Warsan First | Not yet open |
| 3 Oct 2026 | Pioneer Residences and offices | Pioneer Horizon | Ras Al Khor Industrial First | Not yet open |
| 25 Sep 2026 | Haus 99 Residences | Hausen Real Estate Developments S.o.c | Al Barsha South Fifth | Not yet open |
| 25 Sep 2026 | Park Infinia | Riyasaa Properties | Al Barsha South Fifth | Not yet open |
| 25 Sep 2026 | Yigo Luxe | Yangtze International Real Estate | Nadd Hessa | Open |
| 19 Sep 2026 | Beachfront Gates 3 | Dubai South Properties Dwc | Madinat Al Mataar | Not yet open |
| 19 Sep 2026 | Epoque | Reportage Capital | Ras Al Khor Industrial First | Not yet open |
| 17 Sep 2026 | La Vera Creek by Ahmadyar | Ahmadyar | Nad Al Hamar | Not yet open |
| 16 Sep 2026 | Amarae | Buyut Aljiwar S.o.c | Madinat Al Mataar | Not yet open |
| 16 Sep 2026 | Boutique Residences | A H D Capital Real Estate Buying and Selling | Al Jadaf | Not yet open |
| 16 Sep 2026 | Samana Barari Resort | Samana Signature Real Estate Developments | Wadi Al Safa 3 | Not yet open |
| 16 Sep 2026 | Samana Eden Barari | Samana Prime Real Estate Developments | Wadi Al Safa 3 | Not yet open |
| 16 Sep 2026 | The Vault by Imtiaz | Imtiaz Vault | Wadi Al Safa 3 | Not yet open |
| 16 Sep 2026 | The St. Regis Residences | Avenew | Palm Deira | Not yet open |
| 16 Sep 2026 | element by iman | Iman | Al Barshaa South Second | Not yet open |
How this Dubai new launches tracker differs from the portal round-ups
Property portals build their monthly launch lists from developer announcements, so a project appears when its marketing starts. We build this one from the Dubai Land Department's own project register, so a project appears when the government records it.
The two do not line up. A project can be advertised for weeks before it is registered, and some registered projects are never marketed at all. Neither list is wrong; they are answering different questions. If you want to know what you can legally buy into today, the register is the one that counts.
What to check before you buy any of these
A new registration tells you a project exists on paper. It does not tell you the developer will deliver it.
Confirm the escrow account is open and that your payments go into it, not into a company account. Look at what the same developer has already finished and handed over, not at what they have announced. Check the completion date recorded on the register against the one in the brochure. All three are public, and all three are checkable before you commit.
Each launch in detail
One entry per project, straight from the register. There is no starting price here because the register does not record one - that figure comes from the developer, and this page only carries what the Land Department has on file. What you get instead is the filed completion date and the escrow position, neither of which appears in a launch announcement.
Gloas
Gloas is registered to Acube Gloas in Palm Deira. The Land Department first listed it on 7 Oct 2026. The completion date filed with the register is 1 May 2028. Its escrow account is not open yet. Until it is, the developer cannot lawfully take your money, whatever the marketing says. The register values the project at AED 30m.
| Gloas | |
|---|---|
| Developer | Acube Gloas |
| Area | Palm Deira |
| Structure | Development of G+P+6 Residential + Roof |
| First listed on the register | 7 Oct 2026 |
| Filed completion date | 1 May 2028 |
| Escrow account | Not open yet |
| Recorded project value | AED 30m |
Volu by Asak
Volu by Asak is registered to Asak in Al Barshaa South Third. The Land Department first listed it on 7 Oct 2026. The completion date filed with the register is 31 Dec 2027. Its escrow account is not open yet. Until it is, the developer cannot lawfully take your money, whatever the marketing says. The register values the project at AED 22.6m.
| Volu by Asak | |
|---|---|
| Developer | Asak |
| Area | Al Barshaa South Third |
| Structure | Not stated |
| First listed on the register | 7 Oct 2026 |
| Filed completion date | 31 Dec 2027 |
| Escrow account | Not open yet |
| Recorded project value | AED 22.6m |
06 Life Residences
06 Life Residences is registered to Deniz Properties in Al Warsan First. The Land Department first listed it on 6 Oct 2026. The completion date filed with the register is 30 Dec 2028. Its escrow account is not open yet. Until it is, the developer cannot lawfully take your money, whatever the marketing says. The register values the project at AED 40m.
| 06 Life Residences | |
|---|---|
| Developer | Deniz Properties |
| Area | Al Warsan First |
| Structure | Residential Building (2B+G+7 Floors + Roof ) Residential With Retails |
| First listed on the register | 6 Oct 2026 |
| Filed completion date | 30 Dec 2028 |
| Escrow account | Not open yet |
| Recorded project value | AED 40m |
Arche Residence by Evera
Arche Residence by Evera is registered to Evera in Madinat Al Mataar. The Land Department first listed it on 6 Oct 2026. The completion date filed with the register is 22 Sep 2026. Its escrow account is not open yet. Until it is, the developer cannot lawfully take your money, whatever the marketing says. The register values the project at AED 26.1m.
| Arche Residence by Evera | |
|---|---|
| Developer | Evera |
| Area | Madinat Al Mataar |
| Structure | "G+6+R " Residential Buildings |
| First listed on the register | 6 Oct 2026 |
| Filed completion date | 22 Sep 2026 |
| Escrow account | Not open yet |
| Recorded project value | AED 26.1m |
Callista by Zoya
Callista by Zoya is registered to Zoya One Real Estate Developments in Madinat Al Mataar. The Land Department first listed it on 6 Oct 2026. The completion date filed with the register is 31 Oct 2028. Its escrow account is not open yet. Until it is, the developer cannot lawfully take your money, whatever the marketing says. The register values the project at AED 30m.
| Callista by Zoya | |
|---|---|
| Developer | Zoya One Real Estate Developments |
| Area | Madinat Al Mataar |
| Structure | G+4 |
| First listed on the register | 6 Oct 2026 |
| Filed completion date | 31 Oct 2028 |
| Escrow account | Not open yet |
| Recorded project value | AED 30m |
Rigel
Rigel is registered to Acube Rigel in Me'Aisem First. The Land Department first listed it on 6 Oct 2026. The completion date filed with the register is 1 Mar 2028. Its escrow account is not open yet. Until it is, the developer cannot lawfully take your money, whatever the marketing says. The register values the project at AED 27m.
| Rigel | |
|---|---|
| Developer | Acube Rigel |
| Area | Me'Aisem First |
| Structure | Developement of B+G+2P+ 9 Residential + Roof |
| First listed on the register | 6 Oct 2026 |
| Filed completion date | 1 Mar 2028 |
| Escrow account | Not open yet |
| Recorded project value | AED 27m |
Marquis Aura
Marquis Aura is registered to Marquis Star in Madinat Al Mataar. The Land Department first listed it on 3 Oct 2026. The completion date filed with the register is 30 Sep 2029. Its escrow account is not open yet. Until it is, the developer cannot lawfully take your money, whatever the marketing says. The register values the project at AED 100m.
| Marquis Aura | |
|---|---|
| Developer | Marquis Star |
| Area | Madinat Al Mataar |
| Structure | Proposed 2B+G+9+R Residential Building & With retail shops on the ground floor. |
| First listed on the register | 3 Oct 2026 |
| Filed completion date | 30 Sep 2029 |
| Escrow account | Not open yet |
| Recorded project value | AED 100m |
NBCC Al Jawhara (The Jewel)
NBCC Al Jawhara (The Jewel) is registered to Nbcc Overseas Real Estate in Al Warsan First. The Land Department first listed it on 3 Oct 2026. The completion date filed with the register is 31 Dec 2028. Its escrow account is not open yet. Until it is, the developer cannot lawfully take your money, whatever the marketing says. The register values the project at AED 36m.
| NBCC Al Jawhara (The Jewel) | |
|---|---|
| Developer | Nbcc Overseas Real Estate |
| Area | Al Warsan First |
| Structure | Residential Building (UG Services + G+2P+8+P) with Retail @ GF and Swimming Pool. |
| First listed on the register | 3 Oct 2026 |
| Filed completion date | 31 Dec 2028 |
| Escrow account | Not open yet |
| Recorded project value | AED 36m |
Pioneer Residences and offices
Pioneer Residences and offices is registered to Pioneer Horizon in Ras Al Khor Industrial First. The Land Department first listed it on 3 Oct 2026. The completion date filed with the register is 30 Oct 2029. Its escrow account is not open yet. Until it is, the developer cannot lawfully take your money, whatever the marketing says. The register values the project at AED 250m.
| Pioneer Residences and offices | |
|---|---|
| Developer | Pioneer Horizon |
| Area | Ras Al Khor Industrial First |
| Structure | 2B+G+3P+19/20 |
| First listed on the register | 3 Oct 2026 |
| Filed completion date | 30 Oct 2029 |
| Escrow account | Not open yet |
| Recorded project value | AED 250m |
Haus 99 Residences
Haus 99 Residences is registered to Hausen Real Estate Developments S.o.c in Al Barsha South Fifth. The Land Department first listed it on 25 Sep 2026. The completion date filed with the register is 30 Dec 2028. Its escrow account is not open yet. Until it is, the developer cannot lawfully take your money, whatever the marketing says. The register values the project at AED 45m.
| Haus 99 Residences | |
|---|---|
| Developer | Hausen Real Estate Developments S.o.c |
| Area | Al Barsha South Fifth |
| Structure | 2B + G + 5 |
| First listed on the register | 25 Sep 2026 |
| Filed completion date | 30 Dec 2028 |
| Escrow account | Not open yet |
| Recorded project value | AED 45m |
Park Infinia
Park Infinia is registered to Riyasaa Properties in Al Barsha South Fifth. The Land Department first listed it on 25 Sep 2026. The completion date filed with the register is 31 Dec 2028. Its escrow account is not open yet. Until it is, the developer cannot lawfully take your money, whatever the marketing says. The register values the project at AED 36m.
| Park Infinia | |
|---|---|
| Developer | Riyasaa Properties |
| Area | Al Barsha South Fifth |
| Structure | UG+B+G+P+5+R |
| First listed on the register | 25 Sep 2026 |
| Filed completion date | 31 Dec 2028 |
| Escrow account | Not open yet |
| Recorded project value | AED 36m |
Yigo Luxe
Yigo Luxe is registered to Yangtze International Real Estate in Nadd Hessa. The Land Department first listed it on 25 Sep 2026. The completion date filed with the register is 30 Mar 2030. Its escrow account is open, so payments made into it are protected under the escrow law. The register values the project at AED 100m.
| Yigo Luxe | |
|---|---|
| Developer | Yangtze International Real Estate |
| Area | Nadd Hessa |
| Structure | Retail and Residential Building (2B+G+4P+24+R) |
| First listed on the register | 25 Sep 2026 |
| Filed completion date | 30 Mar 2030 |
| Escrow account | Open |
| Recorded project value | AED 100m |
Beachfront Gates 3
Beachfront Gates 3 is registered to Dubai South Properties Dwc in Madinat Al Mataar. The Land Department first listed it on 19 Sep 2026. The completion date filed with the register is 30 May 2029. Its escrow account is not open yet. Until it is, the developer cannot lawfully take your money, whatever the marketing says. The register values the project at AED 231.8m.
| Beachfront Gates 3 | |
|---|---|
| Developer | Dubai South Properties Dwc |
| Area | Madinat Al Mataar |
| Structure | The Project comprises two buildings, with a total of 236 residential apartments and 8 retail units. |
| First listed on the register | 19 Sep 2026 |
| Filed completion date | 30 May 2029 |
| Escrow account | Not open yet |
| Recorded project value | AED 231.8m |
Epoque
Epoque is registered to Reportage Capital in Ras Al Khor Industrial First. The Land Department first listed it on 19 Sep 2026. The completion date filed with the register is 30 Sep 2029. Its escrow account is not open yet. Until it is, the developer cannot lawfully take your money, whatever the marketing says. The register values the project at AED 1m.
| Epoque | |
|---|---|
| Developer | Reportage Capital |
| Area | Ras Al Khor Industrial First |
| Structure | Building |
| First listed on the register | 19 Sep 2026 |
| Filed completion date | 30 Sep 2029 |
| Escrow account | Not open yet |
| Recorded project value | AED 1m |
La Vera Creek by Ahmadyar
La Vera Creek by Ahmadyar is registered to Ahmadyar in Nad Al Hamar. The Land Department first listed it on 17 Sep 2026. The completion date filed with the register is 30 Sep 2029. Its escrow account is not open yet. Until it is, the developer cannot lawfully take your money, whatever the marketing says. The register values the project at AED 92.5m.
| La Vera Creek by Ahmadyar | |
|---|---|
| Developer | Ahmadyar |
| Area | Nad Al Hamar |
| Structure | B+G+Upper Ground + 1 Podium + 12 floor + Roof |
| First listed on the register | 17 Sep 2026 |
| Filed completion date | 30 Sep 2029 |
| Escrow account | Not open yet |
| Recorded project value | AED 92.5m |
Amarae
Amarae is registered to Buyut Aljiwar S.o.c in Madinat Al Mataar. The Land Department first listed it on 16 Sep 2026. The completion date filed with the register is 15 Aug 2027. Its escrow account is not open yet. Until it is, the developer cannot lawfully take your money, whatever the marketing says. The register values the project at AED 20.3m.
| Amarae | |
|---|---|
| Developer | Buyut Aljiwar S.o.c |
| Area | Madinat Al Mataar |
| Structure | UG SERVICES + G+ 6 + R |
| First listed on the register | 16 Sep 2026 |
| Filed completion date | 15 Aug 2027 |
| Escrow account | Not open yet |
| Recorded project value | AED 20.3m |
Boutique Residences
Boutique Residences is registered to A H D Capital Real Estate Buying and Selling in Al Jadaf. The Land Department first listed it on 16 Sep 2026. The completion date filed with the register is 30 Apr 2028. Its escrow account is not open yet. Until it is, the developer cannot lawfully take your money, whatever the marketing says. The register values the project at AED 60m.
| Boutique Residences | |
|---|---|
| Developer | A H D Capital Real Estate Buying and Selling |
| Area | Al Jadaf |
| Structure | G+4P+12+Roof Commercial & Residential Building |
| First listed on the register | 16 Sep 2026 |
| Filed completion date | 30 Apr 2028 |
| Escrow account | Not open yet |
| Recorded project value | AED 60m |
Samana Barari Resort
Samana Barari Resort is registered to Samana Signature Real Estate Developments in Wadi Al Safa 3. The Land Department first listed it on 16 Sep 2026. The completion date filed with the register is 30 Sep 2030. Its escrow account is not open yet. Until it is, the developer cannot lawfully take your money, whatever the marketing says. The register values the project at AED 247.2m.
| Samana Barari Resort | |
|---|---|
| Developer | Samana Signature Real Estate Developments |
| Area | Wadi Al Safa 3 |
| Structure | 3B+G+34+R Hotel |
| First listed on the register | 16 Sep 2026 |
| Filed completion date | 30 Sep 2030 |
| Escrow account | Not open yet |
| Recorded project value | AED 247.2m |
Samana Eden Barari
Samana Eden Barari is registered to Samana Prime Real Estate Developments in Wadi Al Safa 3. The Land Department first listed it on 16 Sep 2026. The completion date filed with the register is 31 Dec 2029. Its escrow account is not open yet. Until it is, the developer cannot lawfully take your money, whatever the marketing says. The register values the project at AED 306.4m.
| Samana Eden Barari | |
|---|---|
| Developer | Samana Prime Real Estate Developments |
| Area | Wadi Al Safa 3 |
| Structure | 4B+G+2P+25+R |
| First listed on the register | 16 Sep 2026 |
| Filed completion date | 31 Dec 2029 |
| Escrow account | Not open yet |
| Recorded project value | AED 306.4m |
The Vault by Imtiaz
The Vault by Imtiaz is registered to Imtiaz Vault in Wadi Al Safa 3. The Land Department first listed it on 16 Sep 2026. The completion date filed with the register is 1 Jun 2029. Its escrow account is not open yet. Until it is, the developer cannot lawfully take your money, whatever the marketing says. The register values the project at AED 47.6m.
| The Vault by Imtiaz | |
|---|---|
| Developer | Imtiaz Vault |
| Area | Wadi Al Safa 3 |
| Structure | B+G+2P+5+R - Mix Used Building (Commercial, Residential & Offices) |
| First listed on the register | 16 Sep 2026 |
| Filed completion date | 1 Jun 2029 |
| Escrow account | Not open yet |
| Recorded project value | AED 47.6m |
The St. Regis Residences
The St. Regis Residences is registered to Avenew in Palm Deira. The Land Department first listed it on 16 Sep 2026. The completion date filed with the register is 30 Sep 2029. Its escrow account is not open yet. Until it is, the developer cannot lawfully take your money, whatever the marketing says. The register values the project at AED 600m.
| The St. Regis Residences | |
|---|---|
| Developer | Avenew |
| Area | Palm Deira |
| Structure | Project Description: Mixed use building comprising of 249 residential units (1BHK=86, 2BHK=10, 3BHK=43, 4BHK=9, 5BHK=3) and 4 retail unit |
| First listed on the register | 16 Sep 2026 |
| Filed completion date | 30 Sep 2029 |
| Escrow account | Not open yet |
| Recorded project value | AED 600m |
element by iman
element by iman is registered to Iman in Al Barshaa South Second. The Land Department first listed it on 16 Sep 2026. The completion date filed with the register is 3 Dec 2029. Its escrow account is not open yet. Until it is, the developer cannot lawfully take your money, whatever the marketing says. The register values the project at AED 68m.
| element by iman | |
|---|---|
| Developer | Iman |
| Area | Al Barshaa South Second |
| Structure | RESIDENTIAL BUILDING (2B+G+11F+R) |
| First listed on the register | 16 Sep 2026 |
| Filed completion date | 3 Dec 2029 |
| Escrow account | Not open yet |
| Recorded project value | AED 68m |
Where new projects in Dubai fit in the wider off-plan market
The 22 launches above are the newest end of a much larger pipeline. At any time there are several hundred off plan projects in Dubai at some stage of construction, and most of what is marketed as new has been on the register for months.
That is the practical difference between this page and a launch round-up. A round-up tells you what is being advertised this month. The register tells you what exists, when it was recorded, and whether the developer is yet allowed to take your money. If you are weighing Dubai off plan property generally rather than one project, start from the escrow position and the delivery record of the developer, because those are the two things that decide whether a launch becomes a home.